The 2 machined pieces.
Fitting and comparing to the existing arm... our version looks as good as the one that was machined professionally!
Seth prepares to weld it up
ZAP, CRACKLERoughly filed down, this part is complete! Now we just need to have it annodized.
Showing posts with label fabrication. Show all posts
Showing posts with label fabrication. Show all posts
Finished the New Thruster Arm
Thursday, July 23, 2009
Posted by Ian at 3:16 PM
Labels: fabrication, thruster, welding
Thruster Arm Progress
Wednesday, July 22, 2009
Posted by Ian at 8:02 PM
Labels: fabrication, lathe, mill, thruster
Plan B: A New Thruster
Tuesday, July 21, 2009
Since we have had no luck finding our lost thruster, we are moving ahead with "Plan B", machining a new thruster arm to hold our spare thruster. We will continue the search for the original, but at least now we can plan to be back in the water and testing by a specific date.
Since this is fairly simple fabrication, it is far faster and cheaper for us to do the machining ourselves at a local shop.
Posted by Ian at 4:34 PM
Labels: fabrication, lathe, plan b, thruster
Subscribe to:
Posts (Atom)